Next week we are calling in for our Insulation and Framing Inspections with the hopes of stocking sheetrock in early March. In the meantime, we are photographing all the interior walls, floors and ceilings, some 500+ shots with a corresponding legend. We also have fans and temporary heat drying the interior of the home as we prepare to moisture test the wood for proper dryness before any insulation goes in.